| $5,000–$9,999 | 5% off |
| $10,000+ | 25% off |
| Wood Sheds | ~4 weeks |
| Metal Buildings | ~12 weeks |
| Greenhouses | ~5 weeks |
Commercial-grade steel buildings for mechanics, contractors, fabricators, and light warehousing. Clear-span interiors, tall eaves, and engineered drawings — ready to expand your operations in weeks, not quarters.
Brick-and-mortar costs are up, lead times are long, and lease rates keep climbing. A steel building gets you operational fast and writes off as a depreciating business asset.
No internal columns to design around. Move forklifts, vehicles, or production lines without working around posts in the middle of the floor.
14′–20′ eave heights, roll-up doors to 14′×14′, and reinforced concrete-ready foundations — for shop trucks, box trucks, and lifts.
Stamped drawings for your jurisdiction, code-compliant snow and wind loads, and documentation your inspector and lender will actually accept.
Drop in your building size and ZIP code — we’ll show you a spray foam price band on the spot. No phone tag.
Upfront prices and monthly estimates. Order as shown or customize it in 3D.
Save 25%
*Monthly amounts are estimates, not an offer of credit. Financing estimate assumes 10% APR for 90 months with approved credit. Rent-to-own estimate is for comparison; your term, tax and delivery may change the payment. Ask a building specialist for an exact quote.
Drop in your dimensions, pick your colors, add doors and windows, and walk around the building in 3D — right in your browser. No salesperson, no commitment. When you like what you see, save the design and we’ll quote it.
Stick-built warehouses take 6–12 months. We measure ours in weeks.
We’ll quote your building with engineering, code package, and delivery to your site — itemized so you can compare apples to apples.
Our stamped drawings go to your jurisdiction. While the permit clears, your concrete contractor pours the slab to our anchor spec.
Our crew erects the building and anchors it to your slab. Most commercial shells go up in under a week and are ready for trades immediately.
“We’d been quoted nine months for a tilt-up. Ascential had us operational in ten weeks from signed quote, including the slab and the permit. Saved us a full season of overflow rent.”
— Verified commercial customer
What business owners typically need to know before signing.
Free, itemized quotes. Engineering included. No hidden costs.
Commercial quotes typically returned within one business day.